Phillip R. Miller Jr.
144
Craft Rd.
West Monroe, La. 71291
318-550-1522 or
318-550-1469
p.rmiller@yahoo.com
Objective:
I am in
search of employment with a company that offers growth, challenges, and
promotes within along with benefits for its employees.
Experience:
June 2014-Present
Byers Engineering
BSTCAD Designer:
Fielded and completed all drawings for new copper and fiber jobs for
AT&T this included all BIC jobs and FTTH, VRAD, UVERSE, GPON, Etc.
March 2013-June 2014
Wood Group Mustang
Utility Inspector:
Inspector over all day to day activity along the south phase of the
Tallgrass Energy Pony Express pipeline from Augusta, Ks. to Cushing, Ok. This
being all phases including Hydro testing, Pigging, fencing, road approaches,
reroutes, tie-ins, lowering in, ditching, HDD, and Road Bores, along with
building job books and redlining for all 24” mainline ball valves
throughout the entire 137 miles of 24” and final audit to client.
September 2012- March 2013
Applied Consultants Inc.
Senior Utility Inspector
Responsible for all aspects of construction within the Eagle Ford
Shale project for BHP Billiton constructing both Gas and Liquid lines
throughout the entire Eagle Hawk and Karnes gathering system. Recorded daily
activity within the work day and compiled spread sheets throughout the jobs
for all work including Fabrication weld logs, Tie-In reports, ditching,
lowering in, Road Bores and HDD profiles once pulled and data received. Also
responsible for all coating activities.
February 2012-September 2012
Westwood Professional Services
Field Coordinator:
Manage pipeline project along a 600 mile route from Cushing, OK. To
Flanagan, IL .Responsible for working with R /W and Survey field employee’s
daily activity and held weekly conference calls while managing all client
requests on a daily basis. Point of contact for client.
October 2011-February 2012
R.S.H. Engineering
Supervisor:
Responsible for all field activities within the Barnett Shell Oil
Field and DCP Midstream in and around the DFW and OK. City area. This being
all client relations and safety briefings for existing and future R.S.H
Engineering personnel. Over seen multiple personnel in daily activities
throughout the project and handled all R/W issues and reroutes per request.
Interacted with client in efforts to produce a finished product for future
work.
October 2009-September 2011
Gulf Interstate Engineering
Project Manager:
Responsible for all coordination and interfacing with Enterprise ROW,
Mapping, and Contractor divisions on a daily basis in efforts to complete
construction on a 33 mile 30” pipeline in Fort Worth, TX. And 67 miles from
Start, la. To Mississippi. I provided daily spread sheets for all
upstream/downstream activities while managing multiple projects with various
scopes while ensuring and maintaining quality control and efficiency in field
project progress, while maintaining and continuing to build relationships
with both clients and co-workers. I have experience with working directly
with coe in Louisiana and FERC experts who work alongside engineering and construction
management personnel to guide them through the environmental permitting
requirements and agreements that are required for their projects. I have
field experience with environmental issues faced on infrastructure projects,
including erosion control and site stabilization, protection of water
quality, biological resource protection, cultural resource management, and
restoration and re-vegetation. I am committed to partnering with our
clients from pre-construction training to long-term monitoring of
re-vegetation success while maintaining clear communication with
owner/contractor project staff to ensure that regulations are followed
throughout a project. I am also responsible for setting up compressor stations
and staying in contact with plant managers on all daily activities. Collected
all information on HDD’s, Bores, Caliber and Pig runs along with Hydro
testing.
October 2003-June 2009
U.P.I.
Utility Inspector:
Responsible for all field activities including lowering in, back
fill, Tie-Ins, Hydro testing and bending. Supervision of 12 survey crews in
effort to build a 20” and 36” pipeline from
Alliance compressor station to Justin, Texas and East Rhome metering
sites. Responsible for all survey activity from preliminary thru final
as-built. This includes but not limited to shooting boundary and center line
for pre-construction in effort to release for bidding purposes; once released
to contractor I am responsible for all data collected on the pipeline.
Through proactive coordination with clients, I will provide field and construction based environmental inspection
services to help our clients avoid violations of environmental permits,
agreements and regulations. This often includes development of environmental
inspection specifications, regular training of contractors, and continuous
review and oversight monitoring of contractor activities to have a zero
compliance record.
July 2000-September 2003
Telplexus Engineering
Project Manager:
Engineering of proposed copper and fiber routes for Aerial and
Underground installation. For Friendship Telecom, Leota, Ks. I was in charge
of all acquisition of ROW information, tax cards, finalizing jobs, tabbing units,
reel footage's, splice footage's, individual and total tabulation sheets for
clients.
September 1994-June 2000
International Fiber Com Inc.
Field Engineer /Spread Supervisor:
Engineering of proposed copper and cable routes this being Aerial and
Underground utilities. Use of Pull Finders, Guy Rules, Duct Pipe sizing
guidelines for
determining cable size.
July1993-September 1994
H.K. Ward & Associates
Lead Inspector:
Overseeing four Inspectors for fiber route in Peoria Illinois,
performing inspection personally while periodically checking to insure
quality as per client and IDOT Guidelines, Experience with Boring Rigs,
Plowing Machines, Trenchers, and blowing of fibers.
August 1989-July 1993
Finley Engineering Services
Osp Engineer:
Engineering of proposed copper and cable routes for Aerial and
Underground utilities, use of Pull Finders, Duct Pipe sizing guidelines for
determining pull on telephone poles at certain degrees, Guy Rule for
determining strand and anchor size to accommodate pull of telephone poles.
Training & Certification
· Hydrogen
Sulfide Awareness Class
· Bloodborne
Pathogens Trained
· H2S
Trained
· Safe Land
USA
· Pipeline
Maintenance PE
· ACTP_
Proctor (National Craft Assessment)
· Pipeline
Core PE
· Smith
System (Driver improvement course)
· AOC
Trained
· NCCER
Certified
· Veriforce
Certified
· CPR
Certified
· Operator
Qualified
· Safeland
USA
· ATV
trained
Tested through
the National Center For Construction Education and Research in 2001. Also
Premier Safety Management, Inc. 2013
EDUCATION:
West Monroe High School
(General Studies)
Ouachita Delta Vo-Tech
(Auto-CAD)